Project Intro
Chemplas have worked alongside Robertson Construction to deliver this self contained Day-Treatment Centre at the Freeman Hospital in Newcastle.
“The centre houses four new state-of-the-art theatres, along with a dedicated pre-operative ward and post–operative recovery areas. The development will enable us to provide thousands of additional procedures in specialties such as musculoskeletal health (MSK), urology, surgery and cardiothoracic services. It will address some of the waiting list challenges caused by the pandemic, through the transfer of suitable day cases from existing theatre lists.”
(The Newcastle Upon Tyne NHS Foundation Trust)
Description
Our scope of works included:
- A Bauder single ply roof using anthracite Thermofol U15 FB membrane.
- A perforated rainscreen built up using Firth Steel N31/1000C profile cladding sheets and 3mm thick aluminium sheets (PPC both sides RAL 6034) fabricated by AKV LTD. When lit up from behind the stunning tree design becomes fully visible.
- Architectural Profiles LTD have created the AP70LCP Dummy Louvred panels and APL live louvre profile AP LB4 double banked system.
It has been a pleasure to be involved in this build and to be part of a team working towards improving our amazing NHS.
Details
Services
Roofing and Cladding
Client
Robertson Construction
Date
August 2022